Workshop/Classroom

A considerable amount of planning was required prior to the manufacture of this building. The Building is set in a  stunning rural location and it was therefore key that it sat well in the surrounding area despite the fact that

East Somerset Railway Case Study

East Somerset Railway In February 2018 we were approached by Gary Amos to see if we would be interested in tendering for the reinstatement of the waiting room at East Summer Railway. We were delighted at this opportunity and were

Art Gallery

A 10 x 5 metre  temporary studio for an Art Gallery, the building had to fit well in to the surrounding area, with a “clean”, pleasant  and airy interior to facilitate the display of the artwork. The building was situated

Games Room

This building always has fond memories and it was nice to go back this year to do some routine maintenance. In 2008 the disused Scout Hut was removed from the site and the owner had Planning Permission to replace it

Open Fronted Timber Garage

Brief Large car port with enclosed store for a tractor, the building had to have an increased eave height to 2.4m to facilitate the tractor; the Clay Tiles were recycled from the previous building. Specification Walls ·        100 x50 mm

RNLI: Case Study

RNLI Poultons have produced several high specification insulated buildings for the RNLI for use as Lifeguard Huts. The Huts all have to be seen from a distance, so by putting signage, Flag poles and red Barge Boards on they can

National Trust: Case Study

National Trust Over the last 15 years the National Trust at Studland has been a big part of Poultons’ winter work. Beach Huts This has included a number of beach huts we have replaced in many challenging positions across the

Danes Hill: Case Study

Brief – A Two Storey Cricket Pavilion featuring a store to the rear – W/C x 2, Kitchen/Entertainment area – an upstairs viewing area and Gym.   20mm x 150mm Western Red Cedar Rebated Shiplap Breather membrane 9mm WBP ply

Request a quote